«New Sanitation Systems & Technologies»

Twin Pits for Pour Flush

secondaryContent

Technology S06

This technology consists of two alternating pits connected to a pour flush toilet (U.4). The blackwater (and in some cases greywater) is collected in the pits and allowed to slowly infiltrate into the surrounding soil. Over time, the solids are sufficiently dewatered and can be manually removed with a shovel.


Proceed to the Technology Description ›››